Skip to content
Call +353 1 870 9210

Reinstatement cost assessments in Arklow

County
Wicklow
Planning authority
Wicklow County Council
Population, Census 2022
13,399
Eircode area
Y14

Request a reinstatement cost assessment in Arklow Call +353 1 870 9210

Why reinstatement cost matters in Arklow

Arklow sits at the mouth of the Avoca River and had 13,399 residents in 2022. It has been an industrial town for well over a century: boatbuilding, the Kynoch munitions factory, which closed shortly after the First World War, Arklow Pottery until 1998, and more recently business parks and data centre proposals. The river divides the town, crossed by the Nineteen Arches Bridge, described as the longest handmade stone bridge in Ireland.

Flooding is the issue most Arklow owners raise first, and it matters for insurance terms. It is separate from the sum insured, which has to reflect the full cost of rebuilding whatever the flood position. Where cover is hard to obtain or carries conditions, an accurate, documented figure is more useful still. Our surveyors travel to Arklow for each inspection; there is no local office.

Buildings and property types in Arklow

  • Main Street. The traditional commercial street, with older two and three-storey buildings and the library and municipal offices that opened in April 2016.
  • Riverside and harbour. The Avoca quays and harbour. John Tyrrell and Son, who built the Asgard II, represent the town's boatbuilding tradition.
  • Bridgewater Shopping Centre. A large retail centre opened in 2007.
  • Business parks. Arklow Business Park and Avoca River Business Park, where a data centre received planning permission in 2019.
  • Infrastructure. The town's wastewater treatment plant, designed by Clancy Moore Architects, was completed at the end of 2024. Planning permission for a plant was first granted in 1993.
  • Religious sites. The Dominican abbey site dates from a land grant of 1264.

What affects reinstatement costs in Arklow

  • Flood history. Wicklow County Council records major flooding in Arklow in 1986, 1989 and 2002, which led to the flood relief scheme being initiated.
  • Arklow Flood Relief Scheme. An Bord Pleanála approved the scheme and its compulsory purchase order on 19 July 2022. It provides for flood defence walls, an embankment, deepening of the Avoca channel and debris and gravel traps. Consultants were appointed in December 2023 to take it through detailed design and construction, with an approved budget of about 57 million euro. A tender notice for the main works framework was published in 2026, so the defences are not yet in place.
  • Working beside the river. Rebuilding on the quays involves tidal water, restricted working space and, during the scheme's construction, coordination with flood defence works.
  • Stone and older commercial buildings. Main Street buildings with solid masonry walls and slate roofs cost more to reinstate than their floor area suggests, particularly where they are on the Record of Protected Structures.
  • Industrial units. Units at the business parks range from basic warehousing to serviced facilities. High-specification services, particularly for data centre use, dominate rebuilding cost and must be itemised.
  • Location. Arklow is at the southern end of County Wicklow, with Gorey in north Wexford the next town south, so contractors can be drawn from either county.

Questions about reinstatement costs in Arklow

How much does a reinstatement cost assessment cost in Arklow?

The fee depends on the size, type, age and complexity of the building, and on the travel to Arklow. We do not publish a flat rate, because a single shop unit and a large mixed-use block need very different amounts of survey time. Send us the address and a short description of the property and we will come back with a fee and a date for the inspection.

How often should a Arklow property be reassessed?

RICS guidance recommends adjusting the reinstatement cost for inflation every year and carrying out a full reassessment every three years, or sooner after significant alterations. The Central Bank also advises reviewing buildings cover at each renewal and after any improvements or extensions.

What does a reinstatement cost assessment in Arklow include?

A measured inspection by a Chartered Building Surveyor, followed by a written report. The figure covers demolition and site clearance, rebuilding to current Building Regulations, professional fees and statutory charges, and the report sets out the VAT position for your broker. It does not include the value of the land or the market value of the property.

What is the difference between market value and reinstatement cost for a Arklow property?

Market value is the price the property would sell for, and it reflects the land and the location. Reinstatement cost is what it would cost to demolish and rebuild the building after a loss, including fees and current regulations. The two can be very different, and buildings insurance should be based on reinstatement cost.

Do you have an office in Arklow?

No. We do not keep an office in Arklow. A Chartered Building Surveyor travels to your property from Rush, Co. Dublin.

What do you need to give me a quote for a Arklow property?

The address, the type of building and what it is used for, its approximate size and age, and anything that has been extended or altered. A phone call or a short email is enough to start.

More about Arklow

When will the Arklow Flood Relief Scheme be finished, and does it affect my cover now?

The scheme was approved in July 2022 and consultants were appointed in December 2023, with the main works tendered in 2026. Until the walls and embankment are built, insurers will assess flood risk on the current position. Your sum insured should be accurate regardless, because it governs every type of claim, not only flood.

My Arklow property flooded in the past. Do I still need a reinstatement cost assessment?

Yes. Past flooding affects whether flood cover is offered and on what terms, but fire, storm and other perils still depend on a correct sum insured. If the figure is too low, the average clause allows the insurer to reduce any claim proportionally. The assessment also records ground floor construction, which helps underwriters.

How do you assess a building on Main Street, Arklow?

We measure all floors and outbuildings, record wall and roof construction, and check whether the building is a protected structure. The figure covers demolition, debris removal, rebuilding and professional fees, with VAT treated according to whether the owner can recover it. Party walls and restricted rear access are allowed for.

Can you assess a unit at Arklow Business Park or Avoca River Business Park?

Yes. We survey the structure, envelope, yards and building services and agree with you where the landlord's responsibility ends and the tenant's begins. For facilities with heavy electrical or cooling installations, those systems are scheduled separately so the insurer can see how the total is made up.

Does the Bridgewater Shopping Centre type of property in Arklow need individual assessment?

Large retail centres always do. They combine long-span structure, mall areas, car parking, lifts and escalators and extensive services. No published guide covers them. A measured assessment by a Chartered Building Surveyor is the normal basis for the sum insured.

Is Arklow too far out for a site visit?

No. We cover the whole of County Wicklow and travel to Arklow for inspections. We do not operate a local office, so the surveyor meets you or your agent at the property. Reports for single buildings are normally issued shortly after the visit.

Sources for the local information on this page
  • en.wikipedia.org: Census 2022 population, coordinates, Nineteen Arches Bridge, Kynoch, Arklow Pottery, Tyrrell boatbuilders, Bridgewater Shopping Centre, business parks, data centre permission, library, wastewater plant, abbey
  • wicklow.ie: Arklow Flood Relief Scheme, flood history of 1986, 1989 and 2002
  • gov.ie: An Bord Pleanála approval, July 2022
  • pleanala.ie: An Bord Pleanála report on the scheme
  • ayesa.com: consultant appointment (December 2023), scope of works and budget
  • ted.europa.eu: 2026 tender notice for the Arklow Flood Relief Scheme main works framework
  • en.wikipedia.org: routing key Y14

Request a reinstatement cost assessment in Arklow

Tell us about the property in Arklow. A Chartered Building Surveyor will come back to you with a fee and a date for the inspection.

What happens next: we review your enquiry and send you a fee proposal and a proposed inspection date.

We use these details only to reply to your enquiry. See our Privacy Policy.